Skip to content

Get all the financial metrics for your brewpub

You’ll know how much revenue, margin, and profit you’ll make each month without having to do any calculations.

Startup costs for a brewpub

This article was written by our expert who is surveying the industry and constantly updating the business plan for a brewpub.

brewpub profitability

Opening a brewpub in 2025 usually requires a total investment between $575,000 and $1.45 million, with premium concepts reaching $2.3 million or more.

This includes location and build-out, brewing and kitchen equipment, licensing, initial inventory, staffing, marketing, interior design, working capital, and a contingency buffer sized to your risk profile.

If you want to dig deeper and learn more, you can download our business plan for a brewpub. Also, before launching, get all the profit, revenue, and cost breakdowns you need for complete clarity with our brewpub financial forecast.

Summary

As of October 2025, most new U.S. brewpubs require $575k–$1.45M to open, driven mainly by facility build-out and brewing equipment scale.

Budget conservatively for permits, working capital (6–12 months), and a 10–20% contingency to prevent cash strain during delays or slow ramp-up.

Cost Category Typical Range (USD) What This Covers (2025 benchmarks)
Total Startup Investment $575,000 – $1,450,000 (up to $2,300,000+) All-in project cost to open: site, build-out, equipment, inventory, staffing, marketing, design, working capital, contingency.
Lease / Purchase / Build-Out Rent: $24,000 – $240,000/yr; Deposit: $2,000 – $60,000; Purchase: $500,000+; Renovation: $50,000 – $300,000 (+$1,000–$8,000 utilities) Commercial lease or acquisition; taproom + kitchen build-out; utility upgrades for brewhouse (power, water, drainage, ventilation).
Brewing Equipment $150,000 – $500,000 (nano: $10,000 – $50,000) Brewhouse (kettle/MLT), fermenters/brite tanks, glycol/refrigeration, cellar, pumps, controls, draft system, small packaging.
Kitchen & Bar Setup $50,000 – $150,000 Hood/ventilation, cookline, refrigeration, dish, smallwares; bar fixtures, tap wall, glassware, POS, backbar refrigeration.
Licenses, Permits, Insurance $20,000 – $75,000 Federal TTB, state/local alcohol licenses, health & business permits, inspections, and first-year insurance premiums.
Opening Inventory (Beer & Food) $30,000 – $100,000 Malt, hops, yeast, adjuncts; CO₂/N₂; food ingredients; disposables; initial beverage and bar consumables.
Staffing (Pre-Breakeven) $100,000 – $250,000 (3–6 months) Brewer(s), kitchen, FOH/bar, management; payroll taxes; training; recruiting/onboarding prior to breakeven.
Marketing & Launch $25,000 – $75,000 Branding, website, signage, digital ads, PR, community events, soft-open & grand-opening campaigns.
Furniture & Interior $50,000 – $150,000 Seating, tables, bar millwork, lighting, décor, acoustics, ADA and customer flow elements.
Working Capital $100,000 – $250,000 6–12 months of cash for rent, payroll, inventory turns, utilities, service contracts, and operating overhead.
Contingency $50,000 – $150,000 (10–20% of total) Buffers unexpected costs: delays, compliance changes, equipment fixes, scope creep, and supply chain variance.

Who wrote this content?

The Dojo Business Team

A team of financial experts, consultants, and writers
We're a team of finance experts, consultants, market analysts, and specialized writers dedicated to helping new entrepreneurs launch their businesses. We help you avoid costly mistakes by providing detailed business plans, accurate market studies, and reliable financial forecasts to maximize your chances of success from day one—especially in the brewpub market.

How we created this content 🔎📝

At Dojo Business, we track the brewpub market daily—from input costs to consumer demand. We combine ongoing conversations with operators, distributors, and equipment vendors with vetted external sources listed at the end of this article. Our custom infographics and in-house illustrations help you see the economics clearly. If you think we missed something, tell us—we’ll respond within 24 hours.

What is the average startup investment required to open a brewpub in today’s market?

Plan for a total startup budget of $575,000 to $1,450,000 for a typical U.S. brewpub in 2025, with upscale or large-footprint projects reaching $2,300,000+.

This range covers site costs, build-out, brewing and kitchen equipment, permits, opening inventory, staffing, marketing, design, and working capital. The single largest levers are location (lease terms and renovation scope) and brewhouse capacity (e.g., 7–15 BBL vs. nano).

Conservative planning assumes a 10–20% contingency added to your subtotal to absorb overruns and compliance delays. As capacity and kitchen complexity grow, each $1 invested in equipment often requires $0.25–$0.50 more across utilities, installation, and build-out.

We cover this exact topic in the brewpub business plan.

State your target capacity up front (barrels per batch and annual throughput) because it drives most capital line items.

How much should be budgeted for leasing, purchasing, or renovating a location suitable for a brewpub?

Expect annual rent between $24,000 and $240,000, security deposits of $2,000–$60,000, and renovations of $50,000–$300,000 plus $1,000–$8,000 for utility upgrades.

Urban property purchases typically start at $500,000, and older buildings increase build-out for drainage, floor loads, ventilation, and three-phase power. Tenant allowances can offset some costs but rarely cover brewing-specific needs like trench drains and glycol piping.

Path Typical 2025 Budget Key Considerations for a Brewpub
Lease (base rent) $24,000 – $240,000/yr Rate per sf, escalations, CAM, exclusivity clauses, patio rights, noise/odor covenants.
Security deposit $2,000 – $60,000 Often 1–3 months’ rent; negotiate letter of credit vs. cash.
Purchase $500,000+ Structural loading for tanks, floor slope, ceiling height, venting paths, parking.
Renovation/build-out $50,000 – $300,000 Taproom, kitchen line, restrooms, ADA, trench drains, waterproofed floors.
Utility upgrades $1,000 – $8,000 3-phase power, water supply, gas sizing, dedicated glycol zones.
Professional fees $10,000 – $40,000 Architect/MEP, structural, permits, inspections, project management.
Owner’s contingency 10–20% of build-out Covers unforeseen code items, lead-time substitutions, and scope expansion.

What are the typical costs of brewing equipment, including kettles, fermenters, refrigeration, and storage?

Full brewpub systems commonly cost $150,000–$500,000; nano systems (1–3 BBL) start around $10,000–$50,000 but limit throughput.

Core drivers are brewhouse size (e.g., 7–10–15 BBL), number of fermenters and brite tanks, glycol/chiller tonnage, and installation/freight. Budget also for pumps, CIP, controls, draft, and small packaging for to-go sales.

Equipment Group Typical 2025 Cost Notes for a Brewpub
Brewhouse (kettle/MLT/HLT) $60,000 – $180,000+ Steam vs. direct fire; automation level; includes platforms and piping.
Fermenters & brite tanks $35,000 – $150,000 Quantity & size matched to turns/week; plan for flagship + seasonals.
Glycol & refrigeration $15,000 – $60,000 Chiller, trunk lines, insulation, controls; allow for future tank adds.
Cellar & pumps $10,000 – $30,000 Transfer pumps, hoses, CIP, clamps, valves, flow meters.
Draft system $8,000 – $25,000 Tap wall, trunk, FOBs, regulators, CO₂/N₂, glass rinsers, drip trays.
Packaging (basic) $5,000 – $30,000 Growlers/crowlers or small canner; labeling and date coding.
Freight & installation $7,000 – $25,000 Rigging, placement, anchoring, utilities tie-in, commissioning.

How much capital is generally needed for kitchen equipment and bar setup?

Allocate $50,000–$150,000 for a professional brewpub kitchen and bar line.

Hood/ventilation, cookline, refrigeration, dish, and smallwares drive cost; bar needs include tap wall, glassware, backbar refrigeration, and POS terminals. Scaling the menu, adding pizza ovens or smokers, and higher throughput quickly raise the number.

Component Typical Range Details
Hood & ventilation $12,000 – $35,000 Make-up air, fire suppression, roof penetrations, permits.
Cookline & hot equipment $10,000 – $40,000 Ranges, fryers, ovens, griddles, holding cabinets per menu.
Cold storage $8,000 – $25,000 Reach-ins, keg coolers, walk-in cooler/freezer space.
Dish & sanitation $5,000 – $15,000 High-temp or chemical, sinks, racks, drains, floor protection.
Smallwares & utensils $4,000 – $12,000 Pans, knives, containers, thermometers, storage systems.
Bar build & fixtures $6,000 – $18,000 Millwork, rails, ice wells, speed racks, glass washers, rinser.
POS & payments $3,000 – $5,000 Terminals, printers, cash drawers, handhelds, subscriptions.

You’ll find detailed market insights in our brewpub business plan, updated every quarter.

What are the expected expenses for licensing, permits, and regulatory compliance at the local, state, and federal levels?

Budget $20,000–$75,000 for permits, licenses, and first-year insurance.

This includes the federal TTB brewer’s notice, state manufacturer/distributor/retail alcohol licenses as applicable, local business and health permits, and inspections. Filing fees are only part of the cost—time, legal help, and mandated build elements often add more.

Item Typical Cost Notes
Federal TTB permits $0 – $1,000 TTB filing itself is low cost; compliance prep takes time.
State alcohol licenses $3,000 – $25,000+ Ranges widely by state; brewery + on-premise privileges.
Local business & health $1,000 – $8,000 City/county permits, health dept., fire inspections.
Engineering & plans $3,000 – $15,000 Architect/MEP drawings, structural loads, ADA compliance.
Legal & compliance services $3,000 – $12,000 Entity setup, license navigation, lease review.
Insurance (year 1) $5,000 – $12,000 GL, liquor liability, property, workers’ comp, product.
Misc. inspections & fees $1,000 – $2,000 Grease, hood, boiler/pressure vessel, elevator (if any).

How much should be allocated for initial raw materials such as malt, hops, yeast, and food supplies?

Set aside $30,000–$100,000 for opening beer and kitchen inventory.

Beer inputs include base and specialty malts, hops (spot or contracted), yeast (propagations), adjuncts, finings, and gases; food requires proteins/produce/dry goods sized to your opening menu and supplier MOQs. Carry an extra 10–15% for price swings or longer lead times.

Opening with 4–6 flagship beers plus 2–3 seasonals usually means more SKUs and safety stock, especially for first-month demand variability. Align turns and cooler space with forecasted seatings, weekday vs. weekend mix, and to-go volume.

This is one of the strategies explained in our brewpub business plan.

Lock in hop contracts selectively to balance cost predictability with flexibility in your rotating lineup.

business plan beer garden

What are the projected staffing costs, including salaries, training, and benefits, before the business reaches breakeven?

Budget $100,000–$250,000 for the first 3–6 months of payroll before breakeven.

Include brewers, kitchen, bar/FOH, management, payroll taxes, and training; add recruiting costs and uniforms. Stagger hiring to align with soft open, grand opening, and expanded hours.

Role/Group 3–6 Mo. Cost Staffing Notes
Head/Lead Brewer $18,000 – $45,000 Recipe control, QA, cellar planning, compliance support.
Kitchen Team $28,000 – $70,000 Chef/kitchen manager plus line/prep/dish sized to covers.
Bar & FOH $25,000 – $65,000 Bartenders, servers, hosts; training for beer styles & pairings.
General Manager/AGM $15,000 – $35,000 Scheduling, cost control, vendor management, events.
Payroll taxes & benefits $8,000 – $20,000 FICA, unemployment, workers’ comp, healthcare stipends.
Recruiting/onboarding $3,000 – $10,000 Ads, screenings, background checks, training materials.
Uniforms & PPE $1,500 – $5,000 Non-slip footwear guidelines, aprons, brewery PPE.

How much should be invested in marketing, branding, and promotional activities before opening and during the launch phase?

  • Allocate $25,000–$75,000 across branding, website, signage, digital ads, PR, and launch events.
  • Front-load spend 60–70% pre-opening for awareness, then 30–40% for the first 60 days post-launch.
  • Prioritize local SEO, beer release calendar, mug club or founders’ memberships, and partnerships with nearby businesses.
  • Use influencer tastings and community fundraisers to earn coverage at low cost.
  • Track CAC and first-90-day repeat rate to adjust spend by channel and event type.

What is the estimated cost of furniture, décor, and interior design to create a customer-ready brewpub environment?

Expect $50,000–$150,000 for furniture, décor, and interior touchpoints.

Line items include seating and tables, bar millwork, lighting, acoustics, wall treatments, planters/art, and outdoor seating if permitted. Durable, cleanable surfaces and smart acoustics directly influence dwell time and repeat visits.

Include signage and wayfinding, ADA adjustments, and family-friendly elements where relevant (high chairs, stroller parking). A phased décor plan can stretch dollars while keeping early guests impressed.

It’s a key part of what we outline in the brewpub business plan.

Prototype the floor plan with full-scale tape layouts to validate aisle width and table counts before purchasing.

business plan brewpub

How much working capital should be set aside to cover operating expenses for the first six to twelve months?

Reserve $100,000–$250,000 to fund 6–12 months of operating expenses as sales ramp.

This should cover rent, payroll, inventory turns, utilities, service contracts, waste hauling, software, and minor maintenance. Base the runway on conservative sales and seasonality assumptions, not optimistic projections.

Monthly Cost Cluster Typical Monthly Working Capital Planning Notes
Rent & occupancy $2,000 – $20,000 Include CAM, property tax pass-throughs, and seasonal utilities.
Payroll (FOH/BOH/Management) $35,000 – $80,000 Adjust for hours by weekday/weekend and patio/open-air seasons.
COGS (beer + food) $25,000 – $60,000 Match to menu mix and draft-to-food ratio; watch wastage/shrink.
Utilities & services $3,000 – $8,000 Water/sewer, gas, power, glycol load, grease & waste services.
Insurance & compliance $1,000 – $3,000 GL/liquor liability/workers’ comp; renewal timing matters.
Marketing & events $2,000 – $7,000 Maintain cadence of releases and community partnerships.
Repairs & maintenance $1,000 – $4,000 Preventive maintenance on brewhouse, draft, and kitchen.

What contingency fund or buffer is advisable to plan for unforeseen expenses during the startup phase?

  • Set a contingency equal to 10–20% of total project cost ($50,000–$150,000+ for most plans).
  • Use it only for true unknowns: permitting/code surprises, long-lead substitutions, or emergency repairs.
  • Keep a decision log and require two approvals for contingency drawdowns.
  • Replenish the buffer if used early to avoid starving working capital.
  • Track vendor delivery risks and pre-approve alternates to reduce overruns.
business plan brewpub

How do financing options such as loans, investors, or grants typically influence the total capital required to start a brewpub?

  • Loans: Expect 20–30% equity/down payment with 5–10 year terms; lenders will also require proof of reserves for contingency and working capital.
  • Equity investors: Reduce debt service but dilute ownership; often require formal reporting and board-level oversight.
  • Grants/incentives: Uncommon but available from local development bodies; lower repayable capital needs when secured.
  • Vendor financing/leases: Can smooth cash flow for equipment; compare implicit rates and buyout terms carefully.
  • Raise toward a full “sources & uses” so you do not underfund ramp-up or compliance milestones.

FAQ recap: How much should I invest in marketing, and what are must-dos before opening?

Commit $25,000–$75,000 to brand, digital, PR, and launch events to seed first-90-day traffic.

Lock your visual identity, signage permits, and photo/video assets early; build a release calendar and mug club pre-sell to convert day-one demand. Coordinate soft opens for staff training and influencer content.

Set channel targets (e.g., 40% organic, 30% local SEO/maps, 20% paid, 10% partnerships) and track CAC, retention, and review velocity. Calibrate budget weekly during the first month to shift to the best-performing levers.

Get expert guidance and actionable steps inside our brewpub business plan.

Use limited-time beer releases to create appointment demand in the first 60 days.

What are realistic costs for furniture, décor, and guest-facing details?

Plan $50,000–$150,000, scaling with seat count and finish level.

Favor durable surfaces, sound control, and sightlines to the brewhouse to tell your story. Outdoor zones and kids-friendly options can boost average party size and dwell time.

Phase non-essential décor to preserve cash and revisit after hitting early revenue milestones. Align table counts to target turns without sacrificing comfort.

This is one of the many elements we break down in the brewpub business plan.

Plan storage for high-chair/booster overflow and seasonal patio inventory.

How do I size my initial raw materials and kitchen inventory without overbuying?

Target $30,000–$100,000 depending on menu breadth, batch size, and expected turns.

Build beer SKUs around capacity and cellar time; plan food par levels by delivery frequency, shelf life, and weekend surges. Keep at least one flagship with short tank residency to stabilize throughput.

Use pre-opening tastings to forecast demand and refine par levels; avoid locking into inflexible hop contracts beyond your flagship needs. Reserve cold storage for the highest-contribution items first.

Calibrate initial purchase orders to 1.2–1.5x your week-1 forecast, then normalize after two weekends of observed demand.

Measure draft system yield weekly to keep shrink in check.

business plan brewpub

What should I know about insurance, safety, and compliance timing?

Include $5,000–$12,000 for first-year insurance within your $20,000–$75,000 compliance budget and start applications early.

Lead times for TTB and state licenses vary; begin submissions before major construction to parallel-path approvals. Keep a clean paper trail for lenders and inspectors.

Schedule inspections (hood, fire, boiler, pressure vessels) with slack to avoid rescheduling fees. Confirm ADA and life-safety requirements early to prevent rework.

Build a compliance calendar and assign owners across licensing, labeling, tax filings, and safety training.

Prototype opening checklists in your POS/ops tool to maintain cadence.

Conclusion

This article is for informational purposes only and should not be considered financial advice. Readers are encouraged to consult with a qualified professional before making any investment decisions. We accept no liability for any actions taken based on the information provided.

Sources

  1. YoLong Brewtech – Microbrewery Startup Costs
  2. Dojo Business – Open a Brewpub (Costs & Steps)
  3. YoLong Brewtech – Starting a Microbrewery (2025)
  4. Dojo Business – Cost to Open a Craft Brewery
  5. RestroWorks – Brewery Setup Cost Guide
  6. MICET – Brewing Equipment Prices in 2025
  7. NBC – Commercial Brewing Equipment Cost (2025)
  8. MICET – Commercial Brewery Equipment 2025 Guide
  9. Upmetrics – Brewery Startup Costs
  10. Square – Owning a Bar & Brewery: Costs
Back to blog

Read More

Tool to calculate the revenue to open a brewpub
Calculate the exact amount you will make when you start your project.